COMPLETED PROJECTS
    SRP Santan Generating Station
  • 8 Economizer Headers
  • 8 Evaporator Headers
  • 8 Superheater Headers
    APS West Phoenix Power Plant
  • 6 Economizer Headers
  • 4 Evaporator Headers
  • 4 Superheater Headers
    APS Red Hawk Power Plant
  • 2 Reheat Headers
    IVRC Power Plant
  • 6 Waterwall Panels
    Colmac Energy
  • 6 Waterwall Panels
    SRP Desert Basin
  • 4,000 ft Boiler Feed Water Piping
    SRP Navajo Generating Plant
  • 2 Stainless Steel Tanks
P-91 AND F-91
    SRP Santan Generating Station
  • Replace De-Superheater
  • Repair Unit 5A Nozzle
  • Repair Unit 5B Nozzle
  • Replace De-Superheater Seal Steam
    APS West Phoenix Power Plant
  • Replace 2 Main Steam Stop Valves
    Gila River Power Plant
  • Replace Main Steam Valve on Unit 1
    14" x Sch 160
    APS Red Hawk Power Plant
  • 4 Superheater Outlet Headers
  • 4 Superheater Inlet Headers
    Mesquite Power Plant
  • Fix Tube Leak Unit 2 HPSH - 3"
  • Repair Vent Line Unit 6 HPSH - 1"
  • Replace Unit 5 HPSH - 2- 3" Bypass Line
  • Fix Tube Leak Unit 5 HPSH - 3"
  • Repair Unit 6 HPSH - 2" Vent Piping
  • Fix Tube Leaks on Unit 2 HPSH - 3" Lower Header
  • Fix Tube Leak on Unit 5 HPSH - 3"
  • Replace Unit 6 HPSH 3" Riser Elbow 10" x Sch 160
  • Replace 2 Unit 5 Attemperator Flanges 3" x Sch 160
  • Installed fittings on double block valves for
    HPSH - 1" 4 Units
  • Installed Hydro Connection for HPSH 2" 4 Units
  • Installed Thermal Well on Unit 6 HPSH 3"
Note: Steam Generation performs Brinell testing before welding and after PWHT for additional QA/QC hardness.